PERMIT APPLICATION AND ENGINEERING DOCUMENTS
1. APPLICATION PORTAL
All applications and permit requests must be submitted electronically through our web-based Portal, accessible by CLICKING ON THE IMAGE BELOW.
You first need to register before you can start an application.

1.1 EXISTING
APPLICATION INQUIRES:
If you have a question, comment, or concern about an existing application, please contact us through the application's Communication Log within the Portal - see the screenshot below.
- Responses to questions/comments related to an application that has already been submitted will only be answered via the Communication Log.
- The Communication Log for your permit can be located under "My Applications" under the yellow drop-down next to the corresponding permit.

2. APPLICATION GUIDELINES, DFMA FORM & HELP
Guidelines:
Required Application Information Documents & Fees (Updated Ver 3.0)
Drainage Improvements Cost – Clarification (New Form)
Application Submittal & Process Guidebook (Updated Ver 3.0)
Application (Start to Finish) Process Flow Chart
"Process & Steps" for Permit Extension Request (08-14-24) (New Form)
The Detention Facilities Maintenance Agreement (DFMA) Application Form is now available under our Application Portal.
Annual Engr Inspection Certificate (rev04-11-24) DFMA EX C and D
Help:
How to Register & Sign In
How to Begin an Application or Request a Pre-Development Meeting
How to Manage Your Application
Frequently Asked Questions (FAQs) (Updated Ver 3.0)
Presentation - Training Session for the Portal Application Submittal
3. PLAT & ENGINEERING DOCUMENTATION
Signature Block for Plat (Preliminary & Final) 02-01-2023
Most Common Review Comments 07-10-24 (NEW)
Construction Notes and Details PRELIMINARY - 20230208v3
Storm Sewer Backup Calculations Table - Template 06-12-24 (NEW)
Master Drainage or Design Report TOC - Template 04-20-23
Drainage_Detention Summary Tables - REV TEMPLATE 04-20-23 - To be included in Drainage Report and Plans
Pre-Construction Notification
As-Built Certificate Ver 1.0
4. MASTER DRAINAGE PLAN(S)
Phase I - Existing Conditions